Home > News > Industry News > Boiler ignition steps recommanded by Sitong's engineer

Boiler ignition steps recommanded by Sitong's engineer

Date:2016-04-27

  1. Put Great interlock into the boiler;

  2. Put the probe into theboilerfurnace;

  3. Calloutinduced draft fanscreen,startit;

  4. Close the induced draft fan inlet baffle;

  5. Close the induced draft fan outlet baffle;

  6. Start the induced draft fan motor (motorturns to greenfrom red on the screen);

  7. After25 seconds, open induced draft fan outlet baffle;

  8. callout the blowerscreen, start operation;

  9. Close the blower inlet baffle;

  10. Close the bloweroutletbaffle;

  11. Start the blower motor (motorturns to greenfrom red on the screen);

  12. After15 seconds,open theblower outlet baffle;

  13. Start the inlet damper of the induced draft fan and the blower,keepthe pressure in the chamber about 50-100Pa;

  14. Put small interlocking, callout the secondary air system screen, adjust secondary air damper in the purge position (30% to 40%);

  15. The "oil leak test" screen, passleak test;

  16. Callout"furnace purge" screen, press the Purge button;

  17. Calloutthe fuel screen, adjust the oil pressure to 2.4Mpa;

  18. Contact other staff, ready to fire the boiler;

  19. Calloutoil system screen, press "start" buttonof oilgun, oil gun automaticallypurge, ignite. The oil gun torch is red.There ischartdisplay fire detection;

Inquiry

Contact us now if you have any question about our company and products [email protected]. Any of your inquiry and suggestion will be highly appreciated. We will keep your information completely private.

Name *
Tel *
Email *
Message *

WANT TO FIND A BOILER FOR YOUR COMPANY ?CONTACT US

Chat Online

Order

+86-13623851818

Facebook

LinkedIn

Youtube